{"id":2415,"date":"2017-06-11T00:00:00","date_gmt":"2017-06-11T00:00:00","guid":{"rendered":"https:\/\/armando.info\/?p=2415"},"modified":"2017-06-11T00:00:00","modified_gmt":"2017-06-11T00:00:00","slug":"the-currency-rounding-that-benefited-odebrecht","status":"publish","type":"post","link":"https:\/\/armando.info\/en\/the-currency-rounding-that-benefited-odebrecht\/","title":{"rendered":"The Currency Rounding that Benefited Odebrecht"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">\"The \r\n'80 -20' must not be known; otherwise, the Tocoma project falls,\" warned one \r\nengineer to another in the middle of the urgency to progress with the works \r\n(once again) of the Manuel Piar hydroelectric plant, in Tocoma, Bolivar state, \r\nin the rich Venezuelan Guayana. It was 2014, and the internal auditors of \r\nCorpoelec, the Venezuelan state power holding company, had months of reviewing \r\nthe work's invoices - including many issued by the Brazilian company Odebrecht - \r\nto find out the reasons for its delay and the great escalation of its \r\ncost.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">In \r\nCiudad Guayana, the industrial and commercial capital of the region, the \"80-20\" \r\nwas an open secret. Engineers, technicians, administrators, trade unionists and \r\nlawyers working there knew that billing in bolivars had been dollarized through \r\nthis mechanism that contravened the exchange control and the initial \r\ncontract.<\/p>\n\n<div class=\"kb-gallery-wrap-id-_G8vl7h-1Q alignnone wp-block-kadence-advancedgallery\"><div class=\"kb-gallery-ul kb-gallery-non-static kb-gallery-type-slider kb-gallery-id-_G8vl7h-1Q kb-gallery-caption-style-below kb-gallery-filter-none kb-gallery-magnific-init\" data-image-filter=\"none\" data-lightbox-caption=\"true\"><div class=\"kt-blocks-carousel splide kt-carousel-container-dotstyle-dark kt-carousel-arrowstyle-whiteondark kt-carousel-dotstyle-dark kb-slider-group-arrow kb-slider-arrow-position-center\" data-slider-anim-speed=\"400\" data-slider-scroll=\"1\" data-slider-arrows=\"true\" data-slider-fade=\"true\" data-slider-dots=\"true\" data-slider-type=\"slider\" data-slider-hover-pause=\"false\" data-slider-auto=\"\" data-slider-speed=\"7000\" data-show-pause-button=\"false\"><div class=\"splide__track\"><ul class=\"kt-blocks-carousel-init kb-blocks-slider splide__list\"><li class=\"kb-slide-item kb-gallery-slide-item splide__slide\"><div class=\"kadence-blocks-gallery-item\"><div class=\"kadence-blocks-gallery-item-inner\"><figure class=\"kb-gallery-figure kb-gallery-item-has-link kadence-blocks-gallery-item-has-caption\"><a href=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1.jpg\" data-description=\"Construction works of the Hydroelectric Power Plant in Tocoma\" class=\"kb-gallery-item-link\"   role=\"button\" aria-haspopup=\"dialog\"><div class=\"kb-gal-image-radius\"><div class=\"kb-gallery-image-contain kadence-blocks-gallery-intrinsic kb-gallery-image-ratio-inherit kb-has-image-ratio-inherit\" ><img loading=\"lazy\" decoding=\"async\" width=\"933\" height=\"622\" src=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1.jpg\"   alt=\"\" data-full-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1.jpg\" data-light-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1.jpg\" data-id=\"52079\" class=\"wp-image-52079 skip-lazy\" srcset=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1.jpg 933w, https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1-700x467.jpg 700w, https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 933px) 100vw, 933px\" \/><\/div><\/div><div class=\"kadence-blocks-gallery-item__caption\">Construction works of the Hydroelectric Power Plant in Tocoma<\/div><\/a><\/figure><\/div><\/div><\/li><li class=\"kb-slide-item kb-gallery-slide-item splide__slide\"><div class=\"kadence-blocks-gallery-item\"><div class=\"kadence-blocks-gallery-item-inner\"><figure class=\"kb-gallery-figure kb-gallery-item-has-link kadence-blocks-gallery-item-has-caption\"><a href=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-2.jpg\" data-description=\"Photo: Odebrecht\" class=\"kb-gallery-item-link\"   role=\"button\" aria-haspopup=\"dialog\"><div class=\"kb-gal-image-radius\"><div class=\"kb-gallery-image-contain kadence-blocks-gallery-intrinsic kb-gallery-image-ratio-inherit kb-has-image-ratio-inherit\" ><img loading=\"lazy\" decoding=\"async\" width=\"624\" height=\"283\" src=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-2.jpg\"   alt=\"\" data-full-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-2.jpg\" data-light-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-2.jpg\" data-id=\"52080\" class=\"wp-image-52080 skip-lazy\"\/><\/div><\/div><div class=\"kadence-blocks-gallery-item__caption\">Photo: Odebrecht<\/div><\/a><\/figure><\/div><\/div><\/li><li class=\"kb-slide-item kb-gallery-slide-item splide__slide\"><div class=\"kadence-blocks-gallery-item\"><div class=\"kadence-blocks-gallery-item-inner\"><figure class=\"kb-gallery-figure kb-gallery-item-has-link kadence-blocks-gallery-item-has-caption\"><a href=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3.png\" data-description=\"Construction works of the Hydroelectric Power Plant in Tocoma\" class=\"kb-gallery-item-link\"   role=\"button\" aria-haspopup=\"dialog\"><div class=\"kb-gal-image-radius\"><div class=\"kb-gallery-image-contain kadence-blocks-gallery-intrinsic kb-gallery-image-ratio-inherit kb-has-image-ratio-inherit\" ><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3.png\"   alt=\"\" data-full-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3.png\" data-light-image=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3.png\" data-id=\"52081\" class=\"wp-image-52081 skip-lazy\" srcset=\"https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3.png 1000w, https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3-700x525.png 700w, https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/11062017-3-768x576.png 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/div><\/div><div class=\"kadence-blocks-gallery-item__caption\">Construction works of the Hydroelectric Power Plant in Tocoma<\/div><\/a><\/figure><\/div><\/div><\/li><\/ul><\/div><\/div><\/div><\/div>\n\n<p class=\"wp-block-paragraph\">\"Tocoma \r\nwas, at least from 2009 to 2014, a big petty cash,\" said an engineer who worked \r\non the dam. It was profitable for many. The initial cost of Tocoma was estimated \r\nat US$ 3.9 billion. Seven years later, in 2014, Venezuela had paid nearly US$ 10 \r\nbillion, partly with loans from the Andean Development Corporation (CAF) and the \r\nInter-American Development Bank (IDB). What happened?<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">Consulted \r\nsources indicate that its initial cost had been increased by rampant inflation, \r\nconstant modifications required by Corpoelec and surcharges by contractors, but \r\nmainly because of a \"comparative advantage\" that Venezuela offered to foreign \r\nand national entrepreneurs in relation to the rest of the world, which blinded \r\nmore than the gold of Guayana: the exchange control that gave rise to the secret \r\naudited by the audit of Corpoelec.<\/p>\n\n\n<h2 class=\"wp-block-heading\">More than Engineering: Financial Prestidigitation<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The \r\nTocoma hydroelectric plant, the works of which started in 2007, scheduled to run \r\nfrom 2012, was mostly carried out by Odebrecht. Due to its size and cost, it was \r\none of the largest hydroelectric infrastructure projects in the country and in \r\nLatin America, comparable in cost and magnitude to the expansion of the Panama \r\nCanal. A million and a half cubic meters (52,972,000.08 cubic feet) of concrete \r\nwere emptied in the place.<\/p>\n\n\n<figure class=\"wp-block-pullquote alignleft\"><blockquote><p>Where there should be ten turbines generating electricity, bilge pumps work instead<\/p><\/blockquote><\/figure>\n\n\n<p class=\"wp-block-paragraph\">Today, \r\nthe block of concrete deteriorates day by day, and in the vaults intended for \r\nten electricity generating turbines, bilge pumps work so that the waters of the \r\nlower Caron\u00ed River do not flood the few installed power systems through some \r\ncracks in its walls.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">In \r\nparallel, it is known that the Prosecutor's Office silently investigates \r\nOdebrecht's irregularities in the country and the Government negotiates the \r\nproject close with contractors. After being questioned by the National Assembly, \r\nneither the civil works contractor OIV consortium (made up of Brazil\u2019s \r\nOdebrecht, Italy\u2019s Impregio and Venezuela\u2019s Vinccler), nor the electromechanical \r\nworks contractor, Argentina\u2019s Impsa (of the problematic group Pescarmona), \r\nexplained why the works stopped. They did not answer a questionnaire sent to \r\ninclude answers in this report either.<\/p>\n\n\n\t\t\t\t<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler wp-block-embed-embed-handler wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n\t\t\t\t<iframe loading=\"lazy\" title=\"ROTACION DE LA PRIMERA TURBINA DEL PROYECTO TOCOMA\" width=\"500\" height=\"375\" src=\"https:\/\/www.youtube.com\/embed\/ckWJGyFZ4eU?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n\t\t\t\t<\/div><\/figure>\n\t\t\t\t\n\t\t\t\t \n\n<p class=\"wp-block-paragraph\">From \r\n2007 to 2012, Venezuela was in full oil boom. The original engineering plans for \r\nthe work were modified by the government, which began to demand more expensive \r\nsupplies, increase the payroll of workers without disregard (from 2,000 to \r\n10,000), and force its \"opening\" by sections, due to political reasons. The new \r\nrequirements increased year by year the cost of the work.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">Corpoelec \r\n\u2013 due to non clarified reasons - started delaying payments to contractors, which \r\nwere to be in bolivars and U.S. dollars under contract, depending on the \r\ncomponent payable. Private companies faced the increase in prices in bolivars \r\nfor salaries and products, and the beginning of a shortage of industrial inputs \r\nthat had to be purchased in the country. \"Neither cement nor rebars could be \r\nbought in the country,\" recalls a former construction engineer. \"There were also \r\nno spare parts available,\" recalls another. \r\n\n<p class=\"wp-block-paragraph\">In \r\n2010, in a meeting between OIV (led by Odebrecht) and Corpoelec, they discuss \r\nthe effect of the constant changes to the contract and the demand for new \r\nmaterials and machinery. The consortium presents a claim to the government: \"The \r\ninitial prices fell short, the exchange control limits me, I charge peanuts in \r\nU.S. dollars and a lot in bolivars, I am spending more dollars than usual with \r\nyour new demands.\" This is the line of argument of the \r\ncontractors.<\/p>\n\n\n<figure class=\"wp-block-pullquote alignleft\"><blockquote><p>The aim was to increase payment in dollars (cheap) and lower the component payable in bolivars<\/p><\/blockquote><\/figure>\n\n\n<p class=\"wp-block-paragraph\">The \r\nsolution came as a percentage: 80-20. The aim was to increase payment in dollars \r\n(cheap) and lower the component payable in bolivars. It worked like that from \r\n2010 to 2014. Corpoelec converted the amount in U.S. dollars of OIV's bill into \r\nbolivars at the preferential exchange rate (4.30). Then it was added to the bill \r\nin bolivars. The total was broken down into two parts, 80% and 20%. The first \r\namount was converted into dollars at a preferential rate, and the second was in \r\nbolivars. Thus, an invoice of Bs. 2.3 billion and US$ 18.8 million became one of \r\nBs. 491 million bolivars and US$ 456.9 million. \"Over 1,000 bills were like \r\nthis,\" says an Odebrecht engineer.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">This \r\n80-20 system was entered into between the parties in Addendum 4A of the \r\ncontract, according to consulted sources, during the management of the then \r\nMinister of Electric Power Al\u00ed Rodr\u00edguez Araque. A consultation by email to the \r\ncurrent ambassador in Cuba was not answered to the date of publication of this \r\narticle. \"Addendum 4A exists and provides for it. The accounts in Tocoma do not \r\nmatch because of this,\" says an Odebrecht engineer.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\"><A \r\ntitle=\"View PRESENTACIO\u00b4N TOCOMA A JUNTA INTERVENTORIA 11-03-14 R3  on Scribd\" \r\nhref=\"https:\/\/www.scribd.com\/document\/350940769\/PRESENTACIO-N-TOCOMA-A-JUNTA-INTERVENTORIA-11-03-14-R3#from_embed\">PRESENTACIO\u00b4N \r\nTOCOMA A JUNTA INTERVENTORIA 11-03-14 R3<\/A>&nbsp;(SUPERVISORY \r\nBOARD TOCOMA PRESENTATION 03-11-14) by&nbsp;<A \r\ntitle=\"View ArmandoInfo's profile on Scribd\" \r\nhref=\"https:\/\/es.scribd.com\/user\/172222252\/ArmandoInfo#from_embed\">ArmandoInfo<\/A>&nbsp;on \r\nScribd<\/p>\n\n<div class=\"lazyblock-embed-script-9vAefE wp-block-lazyblock-embed-script\"><iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/350940769\/content?start_page=1&amp;view_mode=slideshow&amp;access_key=key-MVoOmKkjOkAnD8KZHb2Y&amp;show_recommendations=true\" data-auto-height=\"true\" data-aspect-ratio=\"1.3323485967503692\" scrolling=\"no\" id=\"doc_66362\" width=\"null\" height=\"null\" frameborder=\"0\"><\/iframe><br><\/div>\n\n<p class=\"wp-block-paragraph\">There \r\nwas apprehension between the middle management and Corpoelec project engineers. \r\n\"Everyone knew that that would allow more rip-off,\" recalls another engineer. \r\n\"But the top said that it would be signed. Chavez was pressing on Corpoelec. \r\nThere were elections and a lot of money. \" The contracted staff feared for their \r\nwork if the anti-Pareto law transcended.<BR>On that scheme, OIV charged and \r\nCorpoelec paid price increases, bonuses on meeting work completion dates, and \r\nvaluations. \"More than a thousand bills were paid like this,\" restate one of the \r\ncurrent workers. The pecuniary losses were calculated internally. \"US$ 1 billion \r\nwere paid in that way, a good part in commissions for the Tocoma project \r\nmanagement,\" he added.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Engineers \r\n\u2014some still active in Corpoelec, others already outside\u2014 do not stop showing \r\ntheir astonishment that Tocoma has cost almost twice the expansion of the Panama \r\nCanal (5.4 billion U.S. dollars), or almost four of the cost paid by the country \r\nin dollars for the construction of a similar hydroelectric plant, Caruachi, very \r\nclose to Tocoma, on the bed of the Caron\u00ed River.<\/p>\n\n\n<h2 class=\"wp-block-heading\">In the Tocoma equation, x was always equal to extra payments in U.S. dollars<\/h2>\n\n\n<p class=\"wp-block-paragraph\">From \r\n2007 to 2014, Tocoma experienced peaks and drops in the work rhythm. Corpoelec \r\n\u2018s desperate response in several occasions \u2014for electoral reasons, as the 2012 \r\npresidential elections\u2014 was paying for \"speed-ups\" that would not allow the \r\nopening as scheduled anyway.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">The \r\nmanagement of the Minister of Electric Power Jesse Chac\u00f3n ran into a standstill \r\nof the work in 2013. And in reviewing the causes, a commission of auditors from \r\nCorpoelec found the exchange scam in July of that year. Its members warned the \r\nboard of directors about the irregularity, suggesting that it was linked to an \r\nexchange crime in the hands of Corpoelec\u2019s Engineering Management of Proyectos \r\nde Expansi\u00f3n Generaci\u00f3n Oriente (expansion and power generation \r\nProject).<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">For \r\nexample, they identified two bills for 363 million and 226 million payable in \r\nbolivars for works carried out in the country. Thus, they found that these and \r\nother conversions were made \"without taking into account the current exchange \r\nregulations and the opinion of the corresponding legal instances\" and \"without \r\nhaving prior authorization for such change\". Even so, those bills were later \r\nrestructured and paid mostly in U.S. dollars, an Odebrecht engineer \r\nsaid.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">The \r\nprocedure with the 80-20 system was a pattern, they say. \"The Audit Committee \r\nhighlights the recurrence by Edelca <I>(the state electric power company of the \r\nCaron\u00ed river)<\/I> and Corpoelec in agreeing payments in foreign currency with \r\nthe OIV Tocoma Consortium considering that the works are estimated to be carried \r\nout in the national territory,\" for a total of US$ 635,991,233.19. Payments made \r\nin the country, should be paid in bolivars only, under the contract.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\"><A \r\ntitle=\"View Memo Auditoria OIV on Scribd\" \r\nhref=\"https:\/\/www.scribd.com\/document\/350940736\/Memo-Auditoria-OIV#from_embed\">Memo \r\nAuditoria OIV<\/A>&nbsp;(OIV \r\nAudit Memo) by&nbsp;<A title=\"View ArmandoInfo's profile on Scribd\" \r\nhref=\"https:\/\/es.scribd.com\/user\/172222252\/ArmandoInfo#from_embed\">ArmandoInfo<\/A>&nbsp;on \r\nScribd<\/p>\n\n<div class=\"lazyblock-embed-script-PW2Fy8 wp-block-lazyblock-embed-script\"><iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/350940736\/content?start_page=1&amp;view_mode=scroll&amp;access_key=key-nXAwL0hGVR23Egcu0Eb2&amp;show_recommendations=true\" data-auto-height=\"true\" data-aspect-ratio=\"0.7796024200518582\" scrolling=\"no\" id=\"doc_36458\" width=\"null\" height=\"null\" frameborder=\"0\"><\/iframe><\/div>\n\n<p class=\"wp-block-paragraph\">Alarmed, \r\nthe auditors went to the legal consultancy to analyze the case. In August 2013, \r\nconsultant Alejandro Carrasco gave his opinion: \"The Engineering Management of \r\nProyectos de Expansi\u00f3n Generaci\u00f3n Oriente has been misinterpreting the way of \r\nconverting to payment in U.S. dollars 80% of the amount of the valuation of work \r\nexecuted in foreign currencies and 20% in Bolivars corresponding to the same \r\nvaluation, which should be corrected \".<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">In \r\nthe document, Carrasco mentioned the limits contemplated by the Central Bank's \r\nlaw for the payment of projects in foreign currencies, according to the exchange \r\nagreements. The lawyer confirmed that he had studied the case and that the \r\nprocedure was not in accordance with the initial \r\ncontract.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Other courtesies for the contractors<\/h2>\n\n\n<p class=\"wp-block-paragraph\">In \r\naddition to the 80-20 system, the Auditors of Corpoelec found dozens of \r\nadministrative irregularities, which they declared in several official reports, \r\nall revised for this report.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">For \r\nexample, Odebrecht, Impregilo and Vinccler obtained part of the contracts for \r\nadditional (non-principal) work without bidding, in violation of the bidding \r\nlaw. They also received \"overpayments\", which affected Corpoelec's cash flow. \r\nThey charged increases of up to 30% for claims without being approved by the \r\nappropriate authorities. They were paid, in some items, more than what was \r\nbudgeted. They obtained month extensions for their work without submitting the \r\nmandatory supporting documentation.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">For \r\nits part, Impsa, the Argentine contractor of the turbines, charged US$ 75 \r\nmillion from Corpoelec without having signed a contract. It also received US$ 60 \r\nmillion for equipment sent to the site; collected three million bolivars for \r\nlabor costs that were not justified; assessed a tax at 3% instead of 34%; and it \r\ndid not pay VAT. In addition, it signed a third contract without dating it, \r\nwhich is illegal. On one occasion it incurred in delays in the delivery of work, \r\nfor which it had to pay 4.7 million U.S. dollars to Corpoelec in fines. There is \r\nno evidence that it has done it. In fact, only one and a half out of the 10 \r\nturbines that were paid are installed in Tocoma.<\/p>\n\n\r\n\n<p class=\"wp-block-paragraph\">IDB \r\nand CAF were aware of these illegalities, sources say. Delegates attended the \r\nmeetings of the board of the work periodically to verify progress against \r\ndisbursements. However, they did not sign, as was appropriate, the modifications \r\nto the contracts and continued to finance the work, based on the audit. To the \r\npublication of this report, the requests for information sent by email to both \r\ninstitutions had not been answered.<\/p>\n\n<div class=\"lazyblock-embed-script-B6Q0qr wp-block-lazyblock-embed-script\"><iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/350940740\/content?start_page=1&amp;view_mode=scroll&amp;access_key=key-WryJEK0EIZuvzH6TCrlM&amp;show_recommendations=true\" data-auto-height=\"true\" data-aspect-ratio=\"0.7707442258340462\" scrolling=\"no\" id=\"doc_47769\" width=\"null\" height=\"null\" frameborder=\"0\"><\/iframe><\/div>\n<div class=\"lazyblock-embed-script-DV8hT4 wp-block-lazyblock-embed-script\"><iframe loading=\"lazy\" class=\"scribd_iframe_embed\" src=\"https:\/\/www.scribd.com\/embeds\/351177564\/content?start_page=1&amp;view_mode=scroll&amp;access_key=key-JndKz3VuAHzCVXskkwvY&amp;show_recommendations=true\" data-auto-height=\"false\" data-aspect-ratio=\"0.7268331990330379\" scrolling=\"no\" id=\"doc_13316\" width=\"100%\" height=\"600\" frameborder=\"0\"><\/iframe><\/div>\n<div class=\"wps-pgfw-pdf-generate-icon__wrapper-frontend pgfw-icon-display pgfw-icon-display--default\" style=\"--pgfw-icon-justify:center;\"><a href=\"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/posts\/2415\/?action=genpdf&#038;id=2415\" class=\"pgfw-single-pdf-download-button pgfw-single-pdf-download-button--default pgfw-single-pdf-download-button--icon-only\" title=\"Generate PDF\" style=\"--pgfw-icon-width:25px;--pgfw-icon-height:45px;\" aria-label=\"Download PDF\"><span class=\"pgfw-single-pdf-download-button__media\" aria-hidden=\"true\"><img src=\"https:\/\/armando.info\/wp-content\/plugins\/pdf-generator-for-wp\/admin\/src\/images\/PDF_Tray.svg\" alt=\"\" decoding=\"async\"><\/span><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>A solitary block of concrete, barely protected from flood by sump pumps, lies in the waters of the lower Caron\u00ed River. This is the case of the planned Manuel Piar hydroelectric plant in Tocoma, southern Venezuela, after paying US$ 10 billion \u2014three times the budget and partly with funds from multilateral agencies\u2014 to several contractors, including the controversial Brazilian construction company. Of that amount, at least US$ 1 billion corresponded to irregularly paid foreign currencies through an administrative scheme (80-20, they called it) that an internal audit found, which was used to finance commissions to project management.<\/p>\n","protected":false},"author":81,"featured_media":52082,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"give_campaign_id":0,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","ghostkit_customizer_options":"","ghostkit_custom_css":"","ghostkit_custom_js_head":"","ghostkit_custom_js_foot":"","ghostkit_typography":"","_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2387,2210],"tags":[984,753,686,684,751],"pais":[4216],"serie":[4222],"localizacion":[4227],"ppma_author":[2230],"class_list":["post-2415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-internacionales","category-investigacion","tag-construccion","tag-corpoelec","tag-lavajato","tag-odebrecht","tag-tocoma","pais-venezuela-en","serie-expediente-odebrecht-en"],"acf":{"reportage-top-html":""},"views":2307,"taxonomy_info":{"category":[{"value":2387,"label":"Internacionales"},{"value":2210,"label":"Investigacion"}],"post_tag":[{"value":984,"label":"construccion"},{"value":753,"label":"Corpoelec"},{"value":686,"label":"LavaJato"},{"value":684,"label":"Odebrecht"},{"value":751,"label":"Tocoma"}],"pais":[{"value":4216,"label":"Venezuela"}],"serie":[{"value":4222,"label":"EXPEDIENTE ODEBRECHT"}]},"featured_image_src_large":["https:\/\/armando.info\/wp-content\/uploads\/2020\/12\/portada-ODEBRECHT-TOCOMA.png",1920,784,false],"author_info":{"display_name":"ARMANDO.INFO","author_link":"https:\/\/armando.info\/en\/author\/armando2\/"},"comment_info":0,"category_info":[{"term_id":2387,"name":"Internacionales","slug":"internacionales","term_group":0,"term_taxonomy_id":2387,"taxonomy":"category","description":"","parent":0,"count":127,"filter":"raw","menu_order":"0","cat_ID":2387,"category_count":127,"category_description":"","cat_name":"Internacionales","category_nicename":"internacionales","category_parent":0},{"term_id":2210,"name":"Investigacion","slug":"investigacion","term_group":0,"term_taxonomy_id":2210,"taxonomy":"category","description":"","parent":0,"count":670,"filter":"raw","menu_order":"0","cat_ID":2210,"category_count":670,"category_description":"","cat_name":"Investigacion","category_nicename":"investigacion","category_parent":0}],"tag_info":[{"term_id":984,"name":"construccion","slug":"construccion","term_group":0,"term_taxonomy_id":984,"taxonomy":"post_tag","description":"","parent":0,"count":20,"filter":"raw","menu_order":"0"},{"term_id":753,"name":"Corpoelec","slug":"corpoelec","term_group":0,"term_taxonomy_id":753,"taxonomy":"post_tag","description":"","parent":0,"count":4,"filter":"raw","menu_order":"0"},{"term_id":686,"name":"LavaJato","slug":"lavajato","term_group":0,"term_taxonomy_id":686,"taxonomy":"post_tag","description":"","parent":0,"count":25,"filter":"raw","menu_order":"0"},{"term_id":684,"name":"Odebrecht","slug":"odebrecht","term_group":0,"term_taxonomy_id":684,"taxonomy":"post_tag","description":"","parent":0,"count":48,"filter":"raw","menu_order":"0"},{"term_id":751,"name":"Tocoma","slug":"tocoma","term_group":0,"term_taxonomy_id":751,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw","menu_order":"0"}],"publishpress_future_action":{"enabled":false,"date":"2026-08-13 04:30:10","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"authors":[{"term_id":2230,"user_id":0,"is_guest":1,"slug":"fabiola-zerpa","display_name":"FABIOLA ZERPA","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/posts\/2415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/comments?post=2415"}],"version-history":[{"count":0,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/posts\/2415\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/media\/52082"}],"wp:attachment":[{"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/media?parent=2415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/categories?post=2415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/tags?post=2415"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/pais?post=2415"},{"taxonomy":"serie","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/serie?post=2415"},{"taxonomy":"localizacion","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/localizacion?post=2415"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/armando.info\/en\/wp-json\/wp\/v2\/ppma_author?post=2415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}